On-Site Research and Demonstration Unit

$22,900.00

A fully assembled, factory-tested Continuous Mining Unit that runs 30 to 50 lb of feed per batch, installed and commissioned at your site, with your crew trained to run it. $22,900 for the unit; installation is quoted separately.

This is a research and demonstration instrument. Its price is not a cost per tonne of material processed.

  • Unit: $22,900, fully assembled and factory tested, 30 to 50 lb of feed per batch
  • Installation and training: 3 to 5 days on your site, $9,000 to $13,800 by the number of days, travel and freight billed at cost, three remote support sessions after we leave
  • Lead time: about 1 to 2 months from go-ahead to install; payment in full up front

Your site provides the safety systems and permits: a chlorine scrubber and exhaust, a continuous chlorine gas detector, PPE, eyewash and safety shower, permits for chlorine-evolving work, process chemicals bought locally (acid, salt and caustic) and framing for the containment area. We do not start the unit until the scrubber, exhaust and detector are working.

The Request a quote button opens the Solutions page, where you book the intro call.

Related products

Shopping Cart